How a step dependency is evaluated

The scheduler considers the step entries segment of the current plan job name table to obtain updated results about step-end events.

The step dependency is evaluated at step-end time or at job-end time, including jobs manually set to C (Complete) or E (Ended-in-error), whenever no step-end information is available.

The criteria used to evaluate a step dependency are the same as those described in Evaluating conditions and conditional successor status, with the following two exceptions: