Changing availability for a virtual destination

About this task

If you need to manually change the status of a virtual destination, follow these steps:
  1. Enter the S row command from the MODIFYING A WORK STATION IN THE CURRENT PLAN panel. The following panel is displayed:
    Figure 1. EQQMWDES - Modifying a virtual workstation destination status in the CP
    EQQMWDES --- MODIFYING A VIRTUAL WORKSTATION DESTINATION IN TH Row 1 to 2 of 2 
    Command ===>                                                  Scroll ===> CSR  
                                                                                   
    Enter the row command S to select a destination for modification, or           
    I to browse system information for the destination.                            
    
    Row  Dest.     Status  Extended Status                                         
    cmd  Name                                                                      
    '''' ********  A                                                               
    '''' VDEST2    O                                                               
    ******************************* Bottom of data ********************************
  2. Enter the S row command. The following panel is displayed:
    Figure 2. EQQMWSRV - Modifying a virtual workstation destination status in the CP
    EQQMWSRV --- MODIFYING A VIRTUAL WORKSTATION DESTINATION IN THE CP ------------
    Command ===>                                                                   
                                                                                   
    Enter/change data below:                                                       
    Enter the O command above to modify open time intervals                        
    Enter the V command above to vary work station status                          
                                                                                   
    Work station          : VWS1                                                   
    Destination           : VDEST2                                                 
    Status                : Offline     Waiting for connection                     
                                                                                   
                                                                                   
    CONTROL ON SERVERS ===> Y           Control on parallel servers, Y or N        
    CONTROL ON K1      ===> Y           Control on critical resource K1 , Y or N   
    CONTROL ON K2      ===> Y           Control on critical resource K2 , Y or N   
  3. Enter the V command. The following panel is displayed:
    Figure 3. EQQMWS2P - Modifying workstation status in the current plan
     EQQMWS2P ----- MODIFYING WORK STATION STATUS IN THE CURRENT PLAN --------------
    Command ===>                                                                   
                                                                                   
    Enter data below, and issue END command to change the status:                  
                                                                                   
    Work station          : VWS1                                                   
    Destination           : VDEST2                                                 
    Current Status        : Offline                                                
                                                                                   
    NEW STATUS         ===> _           A active, F failed                         
                                        O offline                                  
    Fail/offline options  :                                                        
                                                                                   
    STARTED OPERATIONS ===> _           R  restart,  L  leave,  E  set to error    

    The values you enter on this panel affect the workload. If you change the destination status to F or O, specify also an action for the operations that are already started on the workstation, by using the STARTED OPERATIONS field.

    A status change on a virtual destination might cause a change in the global status of the virtual workstation it refers to.

    Use this panel to make the virtual destination unavailable. You can set the global status to:
    Offline
    All the destinations are offline, meaning that communication is lost between the controller and the tracker on the system that the destination represents.
    Failed
    All the destinations are in failed status, meaning that the operating system detected a failure on the system that the destination represents.
    Active
    At least one destination is active.
    Inactive
    Some destinations are offline and others are in failed status.
    Note: When you enter the END command on this panel, the status change is effective immediately, even if you enter the CANCEL command on the EQQMWSRV panel.
    To modify open time intervals and adjust the destination fixed resources and parallel servers, enter the O command on the EQQMWSRV panel. The following panel is displayed:
    Figure 4. EQQMWS1L - Modifying open intervals of a virtual WS destination
    EQQMWS1L  MODIFYING OPEN INTERVALS OF A VIRTUAL WS DESTINATION Row 1 to 3 of 3
    Command ===>                                                  Scroll ===> CSR 
                                                                                  
    Change data in the rows, and/or enter any of the following row commands:      
    I(nn) - Insert, R(nn),RR(nn) - Repeat,  D(nn),DD - Delete                     
                                                                                  
    Virtual work station  : VWS1    Virtual destination  : VDEST2                 
    Control on servers    : Yes                                                   
    Control on K1         : Yes                                                   
    Control on K2         : Yes                                                   
                                                                                  
    Row     From             To                 Modified                          
    cmd     YY/MM/DD HH.MM   YY/MM/DD HH.MM     ps    K1 K2                       
    ''''    07/06/07 00.00   07/06/07 05.59     65000 99 99                       
    ''''    07/06/07 06.00   07/06/07 17.59     65000 99 99                       
    ''''    07/06/07 18.00   07/06/07 23.59     65000 99 99                       
    ******************************* Bottom of data ********************************

    To indicate that no operation can run on the selected destination, set the number of parallel servers to 0.

    If you alter the interval details, the altered interval is never replaced by daily planning extend and re-plan functions. For example, consider the following sequence of events:
    1. You modify the number of parallel servers between 18.00 and 23.59 on 07/06/07 to 25.
    2. You change the database to close VDEST2 at 20.00 on 07/06/07.
    3. You extend the plan at 15.00.
    The result is that the destination stays open after 20.00, because there is a modified interval that lasts until 23.59. The scheduler considers that it is modified even if you change the number back to the original value.