Controlling system

You can use this procedure for the controlling system:
  1. Create a workstation description, leave the destination field blank. This means that operations will be submitted to the system where the controller is started.
  2. Create an application description. Define at least one operation on the workstation you have created. Submit a daily planning extend or replan batch job to include the new workstation in the current plan.

    Add an occurrence of this application to the current plan.

  3. Verify that the operations run successfully on this system and that they are reported as complete in the current plan.
  4. Check that submit events are created in the event data set for the controlling system (for details, see Verifying job submission).