Verifying installation of a standby controller

When you have completed the installation tasks for a standby controller, perform initial verification. Because connections cannot be verified in isolation, you can perform further verification of the standby controller after you have installed the controlling system, established connections between HCL Workload Automation for Z systems, and created a current plan. For a detailed description of these verification tasks, see Verifying configuration.

To initially verify the standby controller, perform these tasks:
  1. Ensure that you have completed all the necessary installation tasks.
  2. Start the standby controller, and check the message log (EQQMLOG).