Start the new system

  1. Change JTOPTS CURRPLAN(NEW) to CURRPLAN(CURRENT).
  2. In the BATCHOPT statement used by the batch job, uncomment the JRUNHISTORY parameter if you had commented it out.
  3. Start the controller OPCA. The merged checkpoint data set will enable it to continue reading the event records.
  4. Start all the trackers without BUILDSSX. Ensure that the load modules invoked are still those for the version from which you are migrating.
  5. Stop the trackers after the events in CSA are processed.
  6. Modify the initialization parameters for OPCB. In the OPCOPTS statement, specify BUILDSSX(REBUILD) and SSCMNAME(EQQSSCM1,TEMPORARY). In the INTFOPTS statement, set the PIFHD parameter.
  7. Start the OPCB and OPCS.
  8. Enter the Service Functions dialog on OPCA, and activate job submission (if it is not already active).
  9. Start the OPCC and OPCD systems.
  10. Submit a daily plan replan or extend as soon as possible after migration. Until a new current plan is created, any references to special resources will cause the resource object to be copied from the EQQRDDS to the current-plan-extension data space. This processing has some performance overheads.

    The new-current-plan-extension data set (EQQNCXDS) is built during daily planning to contain all special resources referenced by operations in the new current plan.