Controlling system
You can use this
procedure for the controlling system:
- Create a workstation description, leave the destination field blank. This means that operations will be submitted to the system where the controller is started.
- Create an application description. Define at least
one operation
on the workstation you have created. Submit a daily planning
extend
or replan batch job to include the new workstation in the current
plan.
Add an occurrence of this application to the current plan.
- Verify that the operations run successfully on this system and that they are reported as complete in the current plan.
- Check that submit events are created in the event data set for the controlling system (for details, see Verifying job submission).