Overview of verification

When you have installed a tracker, controller, standby controller, or server, start it and perform initial verification procedures. To fully verify HCL Workload Automation for Z, start all the address spaces in your configuration, and create database entries, a long-term plan, and a current plan. This is required to verify job submission and connections between systems, and requires some knowledge of the product. Therefore, verification is divided into two parts:
  • Initial verification of individual HCL Workload Automation for Z address spaces.
  • Verification of your configuration.
You can therefore perform some verification tasks without needing to know more detailed aspects of HCL Workload Automation for Z. When you are more familiar with the product components and functions, you can perform further testing.

If you are installing a tracker and controller in the same address space, review the initial verification procedures for both a tracker and a controller.