Backup cycle for start-of-day DRP defines the backup intervals required to ensure that you can successfully restore HCL Workload Automation for Z to start-of-day processing. N/A shows that a backup is not applicable for DRP purposes.

Table 1. Backup cycle for start-of-day DRP
ddname Format Defines Backup interval
EQQADDS VSAM Applications and JCL variables Daily
EQQCKPT PS Checkpoint data set N/A
EQQCP1DS VSAM Current-plan-1 data set N/A
EQQCP2DS VSAM Current-plan-2 data set N/A
EQQCXDS VSAM Current-plan-extension data set N/A
EQQDLnn PS Dual job-tracking-log data set N/A
EQQEVDS PS Event data set for the event-writer task N/A
EQQEVDnn PS Event data set for an event-reader task N/A
EQQFLEX PS License data set N/A
EQQHTTP0 PS Event data set for z-centric end-to-end scheduling N/A
EQQINCWK PS JCC incident work file N/A
EQQJBLIB PDS JCL library data set Minimum weekly, daily if high activity
EQQJCLIB PDS JCC message-table data set Minimum weekly, N/A if same as primary
EQQJS1DS VSAM JCL-repository-1 data set N/A
EQQJS2DS VSAM JCL-repository-2 data set N/A
EQQJTARC PS Job-tracking-archive data set N/A
EQQJTnn PS Job-tracking-log data set N/A
EQQLDDS VSAM Work data set for long-term-plan batch jobs See note 1
EQQLTBKP VSAM Long-term plan backup See note 1
EQQLTDS VSAM Long-term plan data set See note 1
EQQMLIB PDS Message library N/A (already in secondary)
EQQMLOG PS Message log N/A
EQQNCPDS VSAM New-current-plan data set N/A
EQQNCXDS VSAM New-current-plan extension data set N/A
EQQOIDS VSAM Operator-instruction database Minimum weekly, daily if high activity
EQQPARM PDS

Initialization-statement-parameter library

Initialization-statement- parameter library

Minimum weekly, daily if high activity
EQQPRLIB PDS Automatic-recovery-procedure library Minimum weekly, daily if high activity
EQQRDDS VSAM Special resource descriptions Daily
EQQSCLIB PDS Scripts and Command library Minimum weekly, daily if high activity
EQQSIDS VSAM ETT criteria and configuration data Minimum weekly, daily if high activity
EQQSTC PDS Started-task-submit data set N/A
EQQSUDS PS Submit/release data set N/A
EQQTWSCS PDSE End-to-end data set for centralized script support N/A
EQQWSDS VSAM Workstation, calendar, and period definitions Minimum weekly, daily if high activity
EQQYPARM PDS Initialization statements parameter library Minimum weekly, daily if high activity
STEPLIB PDS HCL Workload Automation for Z load-module library N/A (already in secondary)
user-defined PS Submit/release data set N/A
Note:
  1. When an LTP or daily-planning batch job runs a copy of the LTP is written to the EQQLTBKP data set. Use EQQLTBKP for your DRP backup to ensure that no updates have occurred before the backup is taken. Perform the DRP backup daily. The contents of the LT, LD and LB data sets must be kept in synch in case a new LTP needs to be re-created from scratch.
  2. HCL Workload Automation for Z issues message EQQN057I to show that a CP backup is complete. You should update the message to include WTO=YES so you can use NetView® to trigger DRP data set backups. Message EQQN051I shows why the CP backup occurred. The DRP backups can be triggered when the scheduler issues message EQQN057I following message EQQN051I with reason "DP END". In fact, now, EQQLTBKP, EQQNCPDS and EQQNCXDS are all synchronized with the other scheduler data.