Creating a flowchart schedule
Follow this procedure to schedule a flowchart.
Procedure
-
On a flowchart tab in View mode, click the
Schedules icon and select
Schedule.
The Override flowchart parameters for dialog box opens.
-
If you want to override the default flowchart parameters, complete the fields in the dialog box
to specify your flowchart parameters. This step is optional.
You can add multiple user variables and data sources by clicking the Add user variable and Add data source links.
The system does not check syntax of the parameters you enter in these fields. Double-check that you have entered the correct values before proceeding.
If you do not want to override default flowchart parameters, go on to the next step.
-
Click Schedule a run to open the Create a schedule dialog box.
You can define when the schedule runs and optionally set up recurrences, triggers, and throttling.
- Click Run with this schedule.
What to do next
Important: When you schedule a flowchart, the scheduled task is based on the
flowchart name. If the flowchart name is changed after a scheduled task is created, the scheduled
task fails.