Task flow for testing with IBM® App Connect Enterprise

You can find information about the tasks that you can perform in HCL DevOps Test Integrations and APIs (Test Integrations and APIs) for testing with IBM® App Connect Enterprise.

The following table provides a list of the tasks that you can perform for testing with IBM® App Connect Enterprise along with the link to the corresponding topic for the details of the task.

Task More information
1. You must complete the prerequisite tasks. Prerequisites for testing with IBM App Connect Enterprise
2. Read about how you can use the synchronization feature in Test Integrations and APIs and about the resources used by the integration node of IBM® App Connect Enterprise. Synchronization of resources in DevOps Test Integrations and APIs
3. You must synchronize the resources used by the integration node of IBM® App Connect Enterprise or a stand-alone integration server with Test Integrations and APIs. Synchronizing DevOps Test Integrations and APIs with the IBM App Connect Enterprise integration node
4. You can run tests and stubs from Test Integrations and APIs that were created after synchronizing with IBM® App Connect Enterprise. Running tests and stubs