Prerequisites for testing with IBM® Integration Bus

Find information about the prerequisite conditions that you must satisfy before you can perform the testing with IBM® Integration Bus in HCL DevOps Test Integrations and APIs (Test Integrations and APIs).

For information about the software versions supported, see System Requirements for DevOps Test Integrations and APIs 2024.03 (11.0.1).

Note: Test Integrations and APIs ships the required JAR files for testing with IBM® Integration Bus and no Library Manager configuration is required.
You must have completed the following tasks before you can synchronize the resources in IBM® Integration Bus with Test Integrations and APIs:
  • Installed IBM® Integration Bus on a computer, if you do not already have a running IBM® Integration Bus set up.
  • Created an integration node in IBM® Integration Bus that you want to connect from Test Integrations and APIs.

Next, you can read about the tasks that you can perform in Test Integrations and APIs for testing with IBM® Integration Bus. See Task flow for testing with IBM Integration Bus.