Step 2. Start ZDT/IMS
If you have added an option for ZDT/IMS to your ISPF Primary Options menu (see Adding ZDT/IMS to your ISPF menu), enter the option value you have assigned to ZDT/IMS and press Enter. For example, if you have assigned ZI to ZDT/IMS, enter ZI and press Enter.
If you defined ZDT/IMS in an ISPF command table (see Defining ZDT/IMS in an ISPF command table) verify that ZDT/IMS can be started by entering the command ZI on any ISPF command line.
The ZDT/IMS Primary Option Menu should be displayed.
Note: The first time you use ZDT/IMS,
a Copyright panel is displayed. After reading the panel text, press Enter.
In subsequent ZDT/IMS sessions, this panel
will not automatically appear.
Enter VER on the command line to display the release level and PTF level of
ZDT/IMS. A panel is displayed, similar to this:
HCL Z Data Tools Version 1 Release 1 Modification 0
IMS Component
(not APF authorized)
Service Levels of installed components
Base IMS Db2 CICS
English -NONE- -NONE- -NONE- -NONE-
Note:
- This will always show ZDT/IMS as
not APF authorized
, even if you have made Z Data Tools APF-authorized, as Z Data Tools cannot run APF-authorized under ISPF. - When you first install Z Data Tools,
-NONE-
will be shown against each component. Subsequently, when you have applied service to Z Data Tools, a PTF number will be shown, indicating the PTF level of each component. If you have not installed a component, that component will not be shown at all. If you have installed the Japanese or Korean language components of ZDT/IMS, another line will be displayed indicating the service level of that component.