Specifying the calendar time periods for performance reports
The standard reports for both Unica Campaign and Unica Interact include performance reports that summarize data over calendar periods.
About this task
To specify time periods that are used in these reports to be something other than the default over time variations, complete the following steps:
Procedure
- Select .
- Expand Campaign or Interact. and select either
- Select the performance schema of interest.
- Click Edit Settings.
- In the Schema Settings section, select the appropriate values for the Over Time Variations option list.
- Click Save Changes.