Assigning final cell codes
You must assign cell codes in your post-optimization flowchart if you do not assign them in the pre-optimization flowchart or the target control spreadsheet.
About this task
For more information about assigning cell codes, see the Unica Campaign User's Guide.
Procedure
- In the Extract process in your flowchart, retrieve optimized contacts by the CellCode field. Follow the instructions in Selecting the package that contains the optimized contacts.
- Add a Segment process to the flowchart and connect the Extract process with the Segment process.
-
Perform a test run of the Extract process.
The Extract process runs and communicates information to the Segment process.
- Configure the Segment process.
- Connect the cells into different contact processes.