Working with flowchart log files
Each flowchart has its own log file, named CampaignName_CampaignCode_ FlowchartName.log. By default, flowchart log files are saved in Campaign_home/partitions/partition_name/logs.
Procedure
- Open a flowchart for editing.
-
Open the Log options menu . The options that are available depend on your
permissions:
- View log: Each flowchart has its own log file, which records events during each flowchart and process run. You can analyze the log file to determine how a flowchart is performing and troubleshoot errors.
- Logging options: Open the Logging options dialog. You can select which Severity levels to include in the log: Information, Warning, Error, Debug. You can also select which categories of Events get logged. For example: Memory allocation, File operations (open, read, write, etc.), Process run, Cell level operations, and so on. You can also specify whether to include the process ID in log entries.
- Enable logging: Check or clear this box to turn logging on or off for the current flowchart.
- Clear log: Remove all existing entries in the log file. To back up the log file before clearing it, open it for viewing and copy the contents to another file.
- Change log path: Specify a different location for the current flowchart log.
- If the log file contains too much information (or not enough), use Logging options to adjust the severity level and event categories, then do a test run of a process and reexamine the log file. When you are done, revert to the default logging level to avoid performance issues.