Project plan for Release 2.0 development

A key shows: a black rectangle equals Release; a white rectangle equals Baseline; a cloud equals Freeze; and an arrow equals Merge. The left black rectangle is marked 1.0. The right black rectangle is marked 2.0 and is preceded by a white rectangle marked 2. The first parallel line, at the top, marked MAJ Team, shows a cloud, the end of an arrow that points up from the second line, another cloud, and another arrow that stops at the white rectangle marked 2. The second parallel line, in the middle, marked MIN Team, shows a cloud, a line that terminates an arrow from the third line, a white rectangle marked 1, the beginning of an arrow that points up to the first line, another cloud, and an arrow that stops at the white rectangle marked 2. The third parallel line, at the bottom, marked FIX team, shows a black rectangle marked 1.01, the start of an arrow that points up to the second line, another black rectangle marked 1.02, and an arrow that ends at the white rectangle marked 2.